#1
Can anyone suggest the desirable structure of a Process Document(LEVEL 2)for service realization industry in line with the requirement of ISO-9001-2K.Thanks in advance.
 
Elsmar Forum Sponsor

Marc

Hunkered Down for the Duration
Staff member
Admin
#2
I recently completed a service industry project. Are you asking for a recommendation on just the format for the level 2 documents?
 
#3
Hi Mark,
You got me right. My interest is to learn the structural feature, so as not to avoid any missing link in completing a process doc.

Thanks
 

Marc

Hunkered Down for the Duration
Staff member
Admin
#4
We did the level 2's in flow charts. The references to sub-documents were on each flow chart.. Other than that they had the 'normal':
1. title
2. disk file name
3. effective date and revision level/date
4. responsibilities and
5. who (dept) responsible for (owns) the procedure.

The problem here is that each company has a different structure and document layout. What you put on each to some degree depends upon what the others have. I wouldn't over complicate the documentation structure.
<hr>
These were some quidelines at one client company:

1. Scope – provide control of documents that meets ISO element 5.5.6 standards. Develop policy and requirements for data base location, document format, security, responsibilities and standards for the creation and maintenance of a document control system.

2. Objectives –
a) Conduct departmental Documentation Sweep of all employees, databases, cabinets, etc. to identify type of documents, location, ownership, format.
b) Determine the quickest and most efficient procedures to create a controlled database of documents by department.
c) Identify resources needed to accomplish the conversion to of a controlled data base.
d) Obtain consensus and support of decisions from senior management, department managers and the ISO 9000 consultant.
e) Insure that the final solution will not delay the date of Pre-Assessment, 10-26-00.

3. Allowable Software - XXXXXX should only be using Microsoft products to produce its documents. This would include the following software:
Word Processing - Microsoft Word
Spreadsheet - Microsoft Excel
Data Bases - Microsoft Access
Gantt Charts - Microsoft Project
Presentations - Microsoft PowerPoint
Flow Charting - Visio (now owned by Microsoft)

4. Other Software - many documents used at XXXX exist in Lotus, PageMaker, etc. formats that came from California and other locations. Accordingly, we will need to:

a) Documents that are not Microsoft and are currently being used will need to be re-typed into the appropriate Microsoft application.

b) Old, previous versions of documents not done in a Microsoft will not have to be converted.

c) Non-Microsoft documents from external sources (i.e., Miami or Atlanta) will be analyzed for conversion on a case by case basis.

5. Standard Header/Footer – this will be outlined for each particular Microsoft application below.

a) Word - IS will develop a template form which will include a macro which will automatically create or update a footer with Document name and path; page numbers; person who authored the document; date created; person who revised the document; date revised. No header specs are needed for Word.

b) Excel - IS will develop a template form which will include a macro which will automatically create or update a footer with Document name and path; page numbers; person who authored the document; date created; person who revised the document; date revised. No header specs are needed for Excel.

c) Visio - IS will develop a template form which will include a macro which will automatically create or update a footer with Document name and path; page numbers; person who authored the document; date created; date revised. The person who revised the document will have a ‘pop up’ request for this to be manually entered. No header specs are needed for Visio.

d) Project - IS will develop a template form which will include a macro which will automatically create or update a footer with the person who authored the document & page numbers. All of the other data will have a ‘pop up’ request for this information to be manually entered: file name and path; create date; person who revised the document; revision date. No header specs are needed for Project.

6. Converting Documents - XXXXX will follow these conversion steps:

Prior to the 10/26/00 Pre-Assessment by the Registrar:

a) Microsoft documents that are currently being used will need to be updated to meet these ISO standards on the next document revision.

b) When a document is revised, it must be converted to the appropriate standards established in this memo. Starting on 8/14/00, documents created or revised must be done according to the new standards.

After the 11/30/00 Assessment by the Registrar:

c) Every item, Microsoft or not, must be converted to the new standards by the next surveillance audit by the Registrar scheduled to be done on or about 6/01/01.

7. Paper Only documents - Any document that is currently being used and is only in a paper format with no corresponding data base existence will have to be created using the new standards prior to 10/16/00.

8. Document File Name & Path - XXXX will adhere to the following naming convention:

Q:\DOCS\DE\documentname.ext

Where: Q is the drive to store and maintain all controlled documents by department.
DOCS is the library name for all controlled documentation.
DE is the two character department name established by management.
Documentname is the unrestricted name of document, which could include a document number and/or document version number.
Document Extension is the software extension name.

9. Security - departmental staff members will only be able to query those items within their respective ‘Q’ drives. The Q drive will be set up with the following configuration and permissions:

Department Name Dept.
Code Staff who can create, revise & delete from the Q:\DOCS library

Note: staff in bold letters are designated ISO reps for Control of Documents outlined in item #11.

10. Documentation Log - a master log of all items under document control must be maintained
in the attached spreadsheet that contains: Document name and path; Document description;
Responsibility; Date created; Date revised; Approved by; Distribution list. This spreadsheet will
catalog all controlled documents regardless of their location or format.

11. Document Control Representative - each department will designate one person to be their Document Control Representative. It must be one of the persons who has the security to create or revise a document (see item #9) and will be responsible for the following items:
a) Review new or revised documentation for adhering to ISO and corporate standards.
b) Keep the Departmental Log up to date at all times.
c) Schedule, track and obtain necessary approvals for new or revised documents.
d) Distribute all new and revised documentation to the appropriate staff.
e) Report any documentation problems or questions to the ISO coordinator.
 
Thread starter Similar threads Forum Replies Date
M Cross Function Process Map for Document Control Process Maps, Process Mapping and Turtle Diagrams 3
T Electronic Document Control - Posting a process at work station ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
S Z299 Special Process Supplement Document Manufacturing and Related Processes 1
Q Chrysler required FMEA and Control Plan Document Audit Forms and Process Audit Check FMEA and Control Plans 7
S CDRH Appeals Process - New FDA Guidance Document Other US Medical Device Regulations 1
J Change in our SharePoint Document Control Process - Is this ok? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 7
I Electronic vs. Paper Copy Document Approval Process Document Control Systems, Procedures, Forms and Templates 9
S MDR (Master Document Register) for Planning of Documents in Process Engineering Document Control Systems, Procedures, Forms and Templates 2
C Process Mapping Electronic Document Control Software Recommendations Quality Tools, Improvement and Analysis 5
Q Process or Departments - Document Content and Managing the Process Approach ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
A Current Control Periodic Document Reviews - Process Updates in the FMEA FMEA and Control Plans 3
B KPI (Key Process Indicator) for Document Control Center ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
P Company Conducted Internal Audit Offsite using a Document Review Process Internal Auditing 65
M Document Changes not affecting the process - Adding Logos, etc. Document Control Systems, Procedures, Forms and Templates 8
S Must I document qualification(s) or qualification process for Internal Auditors? IATF 16949 - Automotive Quality Systems Standard 10
A Implementing a change for a particular Process - Document & Change Control ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 3
T Participation in the Document Review Process from Multiple Sites ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
D The best way to Document Process Details in Accounting ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
T Document Approval Process for Company Documents Document Control Systems, Procedures, Forms and Templates 20
S Document Process Flow though the company - NQA-1 Supplier Document Control Systems, Procedures, Forms and Templates 1
S Process Map of Document Control - Review wanted (Visio) Document Control Systems, Procedures, Forms and Templates 7
S Process Map - Turtle Diagram for Document Control Process Maps, Process Mapping and Turtle Diagrams 3
A Management Review Process Document Management Review Meetings and related Processes 5
Casana How to document Internal Audits done via the "Process Audit" methodology Internal Auditing 9
D The Best Way to Document In-Process Inspections using MIL-STD-1916 1/12 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
A How to Document the Design & Development and Resource Management Process in IT Firm? Design and Development of Products and Processes 2
J ISO 9001:2000 transition - Document and Process Discussion ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 78
Q Process Maps identified as inadequate during registrar's Document audit Process Maps, Process Mapping and Turtle Diagrams 20
D Is a PFMEA (Process FMEA) a record or document? FMEA and Control Plans 10
P Layered Process Audit & the Document Audit - Can anyone explain to me, Please? Process Audits and Layered Process Audits 2
R Expected Process Maps - Requirement to somehow document how these processes work? Process Maps, Process Mapping and Turtle Diagrams 20
S Process Validation from an FDA standpoint - The GHTF document ISO 13485:2016 - Medical Device Quality Management Systems 6
M Benchmarks for Document Control process cycle (turnaround time) Document Control Systems, Procedures, Forms and Templates 5
J Process within Quality Pyramid - Create a new kind of Document IATF 16949 - Automotive Quality Systems Standard 16
P TS16949 - Should specific process notes be considered a controlled document. IATF 16949 - Automotive Quality Systems Standard 4
M Document Review Audit Findings - Design and Process Approach Design and Development of Products and Processes 2
O Evidence for the process of document control Document Control Systems, Procedures, Forms and Templates 17
M Internal Document Request Process - Please Critique ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 6
D Writing a Process Document - Who, what, when, where, and how ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 4
L Seeking TS 16949 Software that deals document control process linkages? Document Control Systems, Procedures, Forms and Templates 4
N Document Formats: Text Procedures vs. Flow Charts (Process Maps) Document Control Systems, Procedures, Forms and Templates 42
J Process Audit Checklist to document Internal Process Audit results Process Audits and Layered Process Audits 19
John Predmore Configuration Management as a process instead of a procedure AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
R PCBA process validation Qualification and Validation (including 21 CFR Part 11) 0
U Internal Auditor not trained but done Audit for some process Nonconformance and Corrective Action 5
B Two excellent examples of process capability analysis from Quality Magazine Capability, Accuracy and Stability - Processes, Machines, etc. 5
D ECO (Engineering Change Order) process questions ISO 13485:2016 - Medical Device Quality Management Systems 7
S Sterilization validation after changing sterilization process provider Qualification and Validation (including 21 CFR Part 11) 3
Pau Calvo Quality Management process is mandatory in ISO9001? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 10
Tagin Template or Checklist for Process Change Document Control Systems, Procedures, Forms and Templates 5

Similar threads

Top Bottom