Our SPC Procedure tells us that our SPC process in the production line, that under normal condition control limits shall be reviewed every quarter. But lately, we won't be able to review the control limits since there were no serious problem that we encountered. Quarterly review is too tight so we decided to chage it as deemed necessary.
Is there any comments from the forum with regards in reviewing Control Limits of SPC??? :bigwave:

Thanks in advance,
Raffy
 
Elsmar Forum Sponsor
M

M Greenaway

What do you mean by not being able to review control limits because no serious problems were encountered ?
 
A

Atul Khandekar

Link Changed

While revisiting this thread, I found one of the links I had posted had changed. I have edited the post to show the new location.
- Atul.
 