Do the requirements of 8.5 apply in the following scenario...
An engineering company designs industrial process systems, procures components, and has the components drop-shipped to the field construction sites. At this point, the contractors (customers) take possession of the components. The contractors build the systems with the components, drawings, specifications, etc. The engineering company then sends field engineers to start-up the systems and conduct training.
So, the processes (4.4) are: proposal (8.2), design (8.3), procurement (8.4), start-up (8.6). No 8.5?
Any input would be appreciated - Thanks!
An engineering company designs industrial process systems, procures components, and has the components drop-shipped to the field construction sites. At this point, the contractors (customers) take possession of the components. The contractors build the systems with the components, drawings, specifications, etc. The engineering company then sends field engineers to start-up the systems and conduct training.
So, the processes (4.4) are: proposal (8.2), design (8.3), procurement (8.4), start-up (8.6). No 8.5?
Any input would be appreciated - Thanks!