Dear sir
I have some question about property of LTPD sampling plan.
Example LTPD 2% with sampling size 116 pcs.
If I have 1100 lots with various defect rate in each lot. (Zero to 5%)
With this samping plan , If I get 1000 lots for Accepted lots. In 1000 Lots will have 900 Lots that have defect <2% and 100 Lots that have defect 2-5%.
Is it correct?