Hello,
I would like to ask you about one issue. In our production we use test station for checking printed circuit board
for corect capacity of condensator. On the begining and on the end of the shift we release this station with reference parts.
We have 3referene part 1-OK, 2-capacity is under the limit, 3-capacity is above limit and station must evaluated correctly.
We check these reference parts 1x/year with measuring capacity 3x, then calculate avarage and uncertainty and check if this is in spcification.
I would like to ask you if this process of checkikg reference parts (measuring capacity 3x, then calculate avarage and uncertainty)
is calibration or verification.
And how we can do MSA for these reference parts.
Thank you for your support.
Martin
I would like to ask you about one issue. In our production we use test station for checking printed circuit board
for corect capacity of condensator. On the begining and on the end of the shift we release this station with reference parts.
We have 3referene part 1-OK, 2-capacity is under the limit, 3-capacity is above limit and station must evaluated correctly.
We check these reference parts 1x/year with measuring capacity 3x, then calculate avarage and uncertainty and check if this is in spcification.
I would like to ask you if this process of checkikg reference parts (measuring capacity 3x, then calculate avarage and uncertainty)
is calibration or verification.
And how we can do MSA for these reference parts.
Thank you for your support.
Martin