If you end up with a failure mode with Severity 9-10 with Occurrence 3 and Detection 3 what approach shall we have?
Would it be ok to state "no action" if we can not bring O & D down without design change ? We understand that a design change can solve the dilemma but if that's not the way out .....
How shall the FMEA manual be understood in this area? How much action is needed ? the goal is of course 10-1-1 but that is not always feasible.
Thanks in advance for your feedback on this topic
Would it be ok to state "no action" if we can not bring O & D down without design change ? We understand that a design change can solve the dilemma but if that's not the way out .....
How shall the FMEA manual be understood in this area? How much action is needed ? the goal is of course 10-1-1 but that is not always feasible.
Thanks in advance for your feedback on this topic